APC 3-Pole Circuit Breaker, 225A, T3 Type for Symmetra PX250/500kW. Output connections: 1 x Hard Wire 3-wire (3PH). Maximum input current per phase: 225 A, Maximum total current draw per phase: 225 A. Certification: CE, UL Listed RoHS. Width: 22" (559 mm), Depth: 21.5" (546 mm), Dimensions (WxDxH): 22 x 21.5 x 17" (559 x 546 x 432 mm). Package dimensions (WxDxH): 22 x 21.5 x 17" (559 x 546 x 432 mm), Package weight: 8.16 lbs (3.7 kg), Package width: 22" (559 mm)
APC APDU10151ME Netshelter Switched Metered NetShelter Rack PDU Advanced power distribution unit (PDU) 40 AC outlet(s) 0U Black
APC APDU10151SW NetShelter 40-Outlets PDU Switched NEMA L6-30P 208 V Network (RJ-45)
APC APDU10450SW Netshelter Switched Metered Netshelter Rack Pdu Advanced Switched 34.6Kw 3Ph 415V 60A 560P6 42 Ou
APC NetShelter Rack PDU Advanced provide reliable power distribution to IT Equipment within server and/or networking racks. Switched outlets to turn outlets on or off remotely. Outlet and PDU level power metering for power visibility and notification of potential overload. 4-in-1 combination outlets which can be used as either C13, C19, C15, or C21 outlets provide unparreled deployment flexibility. Maximum outlet density with 42 outlets in a 2.2 wide form factor. Outlets on the PDUs are color coded and/or labeled by breaker and input phase on 3 phase models to simplify deployment. Provides an alternating phase design whereby each of the 3 phases are organized into small outlet groups which alternate from top to bottom of the PDU to facilitate better power cord management and promote better load balancing. Power Sharing allows PDUs cascaded together via 2 ethernet ports enable an Network Management Card to continue functioning in the event of an AC power loss. No interruption in Network communication, sensors operation, and alarm traps. Live Swap Network Management Card (NMC) which can be replaced without powering down the PDU or connected devices to minimize downtime in the unlikely event of an NMC power event. Rated and approved to operate up to 60C (140F) at full load ensures reliability and availability even in today's high density deployments. Gigabit ethernet to enhance and standardize network connectivity across all assets in the data center. A second ethernet port (10/100) is available to allow cascading to other PDUs, connect to a 2nd private network, or provide network redundancy. 1% metering accuracy for the peace of mind to use NetShelter Rack PDU Advanced to bill based on power usage. In addition, the higher level of accuracy ensures the most precise measures for capacity planning and threshold alarm monitoring. Two environmental sensor ports allow for optional sensors (sold separately) to be connected. For data center deployments across multiple regions, these PDUs are both UL and CE rated providing one PDU that can be used globally to simplify and standardize deployment.
APC AP4431A Netshelter Automatic Transfer Switch 1 x NEMA L6-30R 208 V AC 30 A
Toolless Mounting CapabilitiesUnits do not require additional tools to mount into APC NetShelter VX, which allows the users to quickly and easily mount units in the rear of the enclosure.Vertical Mounting CapabilitiesEasily mounts vertically in racks or enclosures and occupies zero U of valuable rack space, which allows more equipment in the rack. Units that mount vertically are optimized to fit in a NetShelter VX enclosures.- Remote Current Monitoring.- Single-branch power input.- Cord Retention Bracket Compatible.
APC Switched Rack 5.7kVA. Product color: Black. Input connection type: NEMA L21-20P, Output connections: (24) NEMA 5-20R. Cable length: 35.8" (0.91 m). Nominal input voltage: 208 V, AC input frequency: 50 - 60 Hz, Nominal output voltage: 120 V. Certification: cUL,CSA, FCC Part 15 Class A, ICES-003, Industry Canada, UL 60950,UL
APC SYSW250KD Smart-UPS Accessories SYMMETRA PX 250KW STATIC SWITCH MODULE 400/480V TAA Compliance
- Load test port provides simple connection for full testing of a Symmetra PX UPS.- Breaker maintenance bypass panel to isolate the UPS from the critical load.- Smallest footprint minimizes your real estate expenses.- Circuit Breaker Panel provides breaker positions for distribution to racks and power zones.- System mobility PDU equipment can easily be relocated to accommodate a changing data center environment.- Wide Range of applications configure-to-order process allows APC to configure, install, and test complete system before shipping.- Step down transformer placed upstream of the UPS to avoid inrush current and saturation eliminating need to oversize transformer.- Local and web-based monitoring available to customers both in the data center and remotely.- Front-access servicing simplifies installation and maintenance while minimizing space requirements.
Note: Search results and information may differ as they are provided by a third party.
In Stock*: Product stock is updated from the last business day and can change.
MFR: Netgear, Inc
Qty: 1
Part #: GS105NA
